Archive for November, 2009

So as November rolls around, we still have a lot of good weather projects left unfinished. On the other hand there are a few projects that are finished. So here is the done list:

– Removed all concrete from the porch foundation. Put it on craigslist and someone actually picked it up for free. Didn’t have to lift a finger. Thank you

P1030072

Here you see it.

P1030083

And here you don't.

– Boiler is commissioned and making our hot water. Old water heater is ready to be pulled out and put on craigslist

– We bought a bunch of blue jean insulation and insulated the attic

P1030103

– We have made some decisions about the new roof, drawings should be done within a week and we officially committed to our contractor.

– Removed the chimney and patched the roof.

P1030084

Here you see it.

P1030089

Here you see the Metalbestos pipe.

P1030090

Hole in the roof, view from inside.

P1030102

No more chimney in the attic. No more presents from Santa 😦

P1030100

All patched up. Hopefully enough to get us through the winter.

– Staining the sills for the front porch.

P1030093

Redwood sills for the front porch with transparent stain applied.

P1030094

Here's a close up.

Read Full Post »